Bridgecon Construction Ltd.  

2004 - Reconstruction of Crawford Street (Buried Bridge)

Pumping of foaming non-shrink grout
The foaming non-shrink grout material was pumped into the voids under the roadway. This grout could eventually be excavated if this bridge were to ever be unearthed by future generations.