2004 - Reconstruction of Crawford Street (Buried Bridge)
Pumping of foaming non-shrink grout
The foaming non-shrink grout material was pumped into the voids under the roadway. This grout could eventually be excavated if this bridge were to ever be unearthed by future generations.